Columbia Gas Faces Opposition to Pipeline in Union County

From the Marysville Journal-Tribune:
The Union County Commissioners are filing an appeal to a project that would bring nearly five miles of gas line from Jerome Township and into Marysville. 
“While we are not so much opposed to what they are doing, we just don’t feel it goes far enough,” said Tim Hansley, Union County Administrator. 
In December, Columbia Gas submitted a Letter of Notification, indicating they intended to construct a 4.78 miles natural gas pipeline, known as the Marysville Connector, beginning at Watkins-California Road between U.S. 42 and Derio Road and ending on Industrial Parkway near Veyance Technologies. 
While Columbia Gas says the majority of the 12-inch natural gas main will be constructed within permanent private pipeline easements, paperwork from the company says it does not actually have any of those easements yet. In addition to the 4.78-mile length of the pipeline right-of-way, Columbia Gas says it will obtain land rights for staging areas that will be situated along the pipeline right-of-way and other areas needed during construction.
Click here to continue reading. 

Popular posts from this blog

Fracktivist in Dimock Releases Carefully Edited Video, Refuses to Release the Rest

The Second Largest Oil and Gas Merger - Cabot and Cimarex

Is a Strong Oil Demand Expected This Year?